Catching a barge to the work site was all part of the deal on this project.
Our team designed and built a suspended stair access and edge protection to enable maintenance works on each of the 5 dam gates on Canberra’s Scrivener Dam.
Catching a barge to the work site was all part of the deal on this project.
Our team designed and built a suspended stair access and edge protection to enable maintenance works on each of the 5 dam gates on Canberra’s Scrivener Dam.