Last month one of our crews were lucky enough to escape the winter frosts and head West to work on the Tallywalka Bridge.
This was an impressive 175m long rail bridge, consisting of 24 hung scaffolds. The crew utilized the Layher ‘Allround System’ – minimizing components, weight on the bridge and man hours to build with a simple yet effective design. It was a solid effort, a project of which the Dunbar team is really proud!